PI: daydiff
Purpose is to produce difference between two dates
<?_wxt daydiff firstday="" lastday=""?>
The parameters are:
| firstday (optional) | A date in the form: yyyy-mm-dd. If the year-part is set to xxxx, the date is considered a repeating date, repeated each year. | 
| lastday (optional) | A date in the form: yyyy-mm-dd. If the year-part is set to xxxx, the date is considered a repeating date, repeated each year. | 
| absolute (optional) | The PI will allways return a positive integer, absolute value. | 
If one of the day-attributes is unspesified, the date is set to the date of building. At least one of the day-attributes must be set.
A few examples:
<?_wxt daydiff firstday="xxxx-12-24"?> <?_wxt daydiff lastday="xxxx-12-24"?>
will in trurn produce the days since christmas and the days until christmas.
 
   
 
 
 
		    